止水带的注意事项
Precautions for waterstops

      先将外面的纸撕掉,直接安装在混凝土缝隙的表面,每隔一米的距离就要安装一个水泥钉,要和混凝土固定牢固,防止偏移,同时要将止水条和表面安装牢固。再安装接头,上下重叠搭接。最后把止水条切入到槽内,之后浇筑水泥,才能够保证缝隙被填满。

1.膨胀止水条施工工艺:先在混凝土内预留好止水条的安装槽;再将浇混凝土模板拆掉,并把表面清理干净;接着把止水条放到预先留好的凹槽里面,如果没有预留凹槽,可使用粘结剂粘贴或水泥钉固定;浇筑混凝土;安装时,要防止水泥受到污染或水的干扰,否则会影响后续使用。

2.橡胶止水带精确的进行施工与装置橡胶止水带,最关键的橡胶止水带,咱们知道橡胶止水带是在混凝土浇注过程中橡胶止水带有些或全部浇埋在混凝土中。因为混凝土中有许橡胶止水带多尖角的石子和锋利的钢筋,所以在浇捣过程中,浇捣压力,以防止刺破止水带。因为塑料和橡胶的抗断撕裂强度比拉伸强度低3-5倍,所以假如遇水胀大橡胶止水带被刺破将会大幅度下降商品反抗外力的能力。故在施工中要分外留意。

3.遇水膨胀止水条怎么使用:首先等施工处缝隙都硬化干涸后将上面清理好。施工前,取下止水条的包装,顺着缝隙的走向将止水条用钉子或胶水固定好,防止出现位移的情况;最后连接遇水膨胀止水条,将两个需要连接的止水条修整好,连接后用手按压,再用水泥钉固定好即可。

First, tear off the outer paper and install it directly on the surface of the concrete gap. Install cement nails every one meter and firmly fix them to the concrete to prevent deviation. At the same time, install the water stop strip and surface firmly. Install the joint again, overlapping the top and bottom. Finally, insert the sealing strip into the groove and pour cement to ensure that the gap is filled.
1. Construction process of expansion waterstop: First, reserve the installation groove for the waterstop in the concrete; Remove the pouring concrete formwork and clean the surface; Next, place the sealing strip in the pre reserved groove. If there is no reserved groove, it can be fixed with adhesive or cement nails; Pouring concrete; During installation, it is important to prevent cement from being contaminated or disturbed by water, as this may affect subsequent use.
2. Precise construction and installation of rubber waterstops, the most crucial of which is the rubber waterstop. We know that rubber waterstops are partially or completely embedded in concrete during the pouring process. Because there are many sharp stones and sharp steel bars in the concrete with rubber waterstops, during the pouring and tamping process, the pouring and tamping pressure is used to prevent puncturing the waterstops. Because the breaking and tearing strength of plastic and rubber is 3-5 times lower than the tensile strength, if the rubber waterstop is punctured due to water swelling, it will significantly reduce the ability of the product to resist external forces. Therefore, special attention should be paid during construction.
3. How to use the expansion sealing strip when encountering water: First, wait for the gaps at the construction site to harden and dry, and then clean the top. Before construction, remove the packaging of the water stop strip and fix it with nails or glue along the direction of the gap to prevent displacement; Finally, connect the expansion waterstop when encountering water, trim the two waterstops that need to be connected, press them by hand after connection, and then fix them with cement nails.1、 The waterstop should not be exposed to sunlight for a long time, to prevent rain, and not come into contact with highly polluting chemicals.
2、 During transportation and construction, prevent mechanical and steel damage to the waterstop.
3、 During the construction process, the water stop must be reliably fixed to avoid displacement during concrete pouring and ensure the correct position of the water stop in the concrete.
4、 The methods for fixing the waterstop include: using additional steel bars for fixation, using specialized fixtures for fixation, and using lead wires and templates for fixation (as shown in the figure). If perforation is required, it can only be installed at the edge of the waterstop and other parts must not be damaged.
5、 When ordering, users should calculate the product length based on the engineering organization and design drawings. The irregular structure should have a drawing description, and try to connect the water stop as a whole in the factory. If on-site connection is required, electric heating plate vulcanization bonding or cold bonding (rubber water stop) or welding (plastic water stop) can be used.

如您有意咨询请给我们君见玮致电
我们期待您的来电!

If you are interested in consulting, please call us Jun Jianwei We look forward to your call!

咨询电话:18733020585 18508222730

Consultation hotline

我们知道止水螺杆普遍的操作方法是木模板或复合型模版时选用,止水螺杆这一在标准里〈施工工艺〉的规定是常见间隔在400~600,实际的间隔,应当看施工计划设计方案上的要求,由于有的的地区施工单位墙的薄厚非常后,这类状况下止水螺杆间隔就规定就大。实际间隔牵涉到止水螺杆的应用直径、框架柱的高宽比,再开展实际的测算就可以得到。

We know that the common operating method for water stop screws is to use wooden templates or composite templates. In the standard “Construction Technology”, the spacing for water stop screws is usually between 400 and 600. The actual spacing should depend on the requirements of the construction plan design scheme. Due to the extremely thin thickness of the construction unit wall in some areas, the spacing for water stop screws is specified to be large in such situations. The actual spacing involves the application diameter of the water stop screw and the aspect ratio of the frame column, which can be obtained by conducting actual calculations.

PVC管材的安装方法: 1,PVC管在与钢管连接的时候,要先将钢管的连接处擦胶水,将PVC管加热后变软不会烧焦,然后承插在钢管上做降温处理。 2,粘接的时候严禁沾到水,PVC管必须放平在沟内,接头24小时后开始回填,要将管道的四周填紧,接头部位大批量回填。 3,玻璃纤维固化剂配成的树脂溶液浸渍玻璃纤维布之后,均匀缠绕在管道的渗漏出然后固化形成玻璃钢。 4,套补粘接法主要是针对管道小孔和接头的渗漏,选用统一的口径管材将其纵向剖开,然后将管内和外表面打毛,涂胶后在漏水处贴紧。

Installation method of PVC pipes:

1. When connecting PVC pipes to steel pipes, the joints of the pipes should be rubbed with glue first, and the PVC pipes should be heated to become soft without burning. Then, they should be inserted onto the steel pipes for cooling treatment.

2. During bonding, it is strictly prohibited to touch water. PVC pipes must be placed flat in the trench, and backfilling should begin 24 hours after the joint. The surrounding areas of the pipeline should be filled tightly, and the joint parts should be backfilled in large quantities.

3. After the resin solution prepared with glass fiber curing agent is impregnated with glass fiber cloth, it is evenly wrapped around the leakage of the pipeline and then solidified to form fiberglass.

4. The patching and bonding method is mainly aimed at the leakage of small holes and joints in the pipeline. A unified caliber pipe material is selected to longitudinally cut it open, and then the inner and outer surfaces of the pipe are roughened. After applying glue, it is tightly adhered to the leaking area.

一、钢筋连接套筒和钢筋接头的使用安装 1、钢筋就位:将丝头查验合格的钢筋搬运至待联接处。 2、接头拧紧:运用扳手或管钳等东西将联接接头拧紧。 3、作符号:对现已拧紧的接头作符号,与未拧紧的接头区分隔。 4、施工查验:对施工完的接头进行的质量查验。 5、绑扎其它钢筋。 钢筋接头加工的技术是需要十分慎重的进程需要的,我们可以经过比较其他加工技术而言,钢筋接头的技术进程是十分慎重的。

1、 Use and installation of steel bar connection sleeves and steel bar joints 1. Steel bars in place: Transport the steel bars that have passed the wire head inspection to the joint to be connected. 2. Joint tightening: Use a wrench or pipe wrench to tighten the joint. 3. Mark: Mark the joints that have been tightened and separate them from the area of the joints that have not been tightened. 4. Construction inspection: Quality inspection of joints after construction. 5. Bind other steel bars. The technology of processing steel bar joints requires a very cautious process, and we can compare it with other processing technologies. The technical process of steel bar joints is very cautious.

一、提高施工质量 铁马凳的采用,对建筑施工来说,是一种施工技术,因产品为工厂标准化、规格化生产,故其质量比人工制作的马镫更为标准,更加控制板楼下层钢筋保护层的标准性,并有效控制了上下层钢筋的间距。而且通过支架的使用,便于工地施工管理的规范,减少施工随意性。 二、提高施工效率 与传统人工工地现场制作的马镫相比,铁马凳因产品轻巧,安装简便,易于定位,从而减小施工人员劳动强度,通过实际使用情况测算,平均提高现场钢筋施工效率20%左右,在加快了钢筋混凝土施工进度的同时降低了施工成本。并且减少了工地的焊接,有利于提高项目施工的安全性。 三、降低施工成本 铁马凳的使用不仅有效控制工地废料的产生(包括工人现场制作马镫的认为损耗),而且减少了工人现场加工量,节约了工地现场用电量,很大程度降低了生产成本。并且我公司的产品价格比施工现场所用废钢筋制作的铁马凳节约成本30%左右,比用成品钢筋制作的马镫节约成本50%左右,直接降低施工成本。

1、 The use of iron horse stools to improve construction quality is a construction technology for building construction. As the product is standardized and produced by the factory, its quality is more standardized than that of manually made stirrups, which better controls the standardization of the protective layer of the lower steel bars in the slab building and effectively controls the spacing between the upper and lower steel bars. Moreover, the use of brackets facilitates standardized construction management on the construction site and reduces the randomness of construction. 2、 Compared with traditional manual on-site production of stirrups, the iron horse stool reduces the labor intensity of construction personnel due to its lightweight, easy installation, and easy positioning. Based on actual usage, it increases the on-site steel bar construction efficiency by an average of about 20%, accelerating the progress of reinforced concrete construction and reducing construction costs. And it reduces welding on the construction site, which is beneficial for improving the safety of project construction. 3、 The use of iron horse stools to reduce construction costs not only effectively controls the generation of waste materials on the construction site (including the perceived loss of stirrups made by workers on site), but also reduces the on-site processing volume of workers, saves electricity consumption on the construction site, and greatly reduces production costs. And our company’s product price saves about 30% of the cost compared to the iron horse stool made of waste steel bars on the construction site, and about 50% of the cost compared to the stirrup made of finished steel bars, directly reducing construction costs.