一般上杆离地高度为1.0~1.2m,下杆离地高度为0.5~0.6m,立杆间距不宜大于2.0m。

1、当高处工作面边缘无围护或围护高度小于800 mm时,应设置连续护边设施,钢管和栏杆为48*3.5mm管,用扣件或电焊固定,栏杆底部用24面高30cm的砖墙严密固定,并抹砂浆。

2.当基坑深度大于2m时,应按要求设置连续护边设施,洞口短边尺寸小于1500mm,防护网采用φ6单层双向钢筋,网格间距≤200mm,混凝土浇筑前在模板内预设,拆模后,孔的上部用硬质材料封闭,并用铁丝将孔绑在预留的钢筋上,或锯出相当大的一块木板固定在孔内进行硬质保护。

3.防护栏杆由上下栏杆和栏杆柱组成,上杆距防护面不小于1.2m,下杆不小于0.6m当钢轨长度超过2m时,必须增设栏杆立柱,包括垂直支撑架、上下横撑、连接件、底座和防护网,垂直支撑架的下端固定在底座上,上下横撑固定在垂直支撑架之间,两个以上的连接件固定在垂直支撑架外端的侧壁上。

Generally, the height of the upper pole from the ground is 1.0~1.2m, and the height of the lower pole from the ground is 0.5~0.6m. The spacing between upright poles should not be greater than 2.0m.
1. When there is no enclosure at the edge of the high work face or the enclosure height is less than 800 mm, continuous edge protection facilities should be installed. The steel pipe and railing are 48 * 3.5mm pipes, fixed with fasteners or welding. The bottom of the railing is tightly fixed with 24 30cm high brick walls and plastered with mortar.
When the depth of the foundation pit is greater than 2 meters, continuous edge protection facilities should be set up as required. The size of the short edge of the opening is less than 1500mm, and the protective net should be used φ 6 single-layer bidirectional steel bars, with a grid spacing of ≤ 200mm, are pre-set in the formwork before pouring concrete. After removing the formwork, the upper part of the hole is closed with hard material, and the hole is tied to the reserved steel bar with iron wire, or a relatively large wooden board is sawn out and fixed in the hole for hard protection.
3. Protective railings are composed of upper and lower railings and railing pillars. The distance between the upper pole and the protective surface is not less than 1.2m, and the lower pole is not less than 0.6m. When the length of the steel rail exceeds 2m, railing pillars must be added, including vertical support frames, upper and lower horizontal braces, connectors, bases, and protective nets. The lower end of the vertical support frame is fixed on the base, the upper and lower horizontal braces are fixed between the vertical support frames, and two or more connectors are fixed on the side wall of the outer end of the vertical support frame.

如您有意咨询请给我们君见玮致电
我们期待您的来电!

If you are interested in consulting, please call us Jun Jianwei We look forward to your call!

咨询电话:18733020585 18508222730

Consultation hotline

我们知道止水螺杆普遍的操作方法是木模板或复合型模版时选用,止水螺杆这一在标准里〈施工工艺〉的规定是常见间隔在400~600,实际的间隔,应当看施工计划设计方案上的要求,由于有的的地区施工单位墙的薄厚非常后,这类状况下止水螺杆间隔就规定就大。实际间隔牵涉到止水螺杆的应用直径、框架柱的高宽比,再开展实际的测算就可以得到。

We know that the common operating method for water stop screws is to use wooden templates or composite templates. In the standard “Construction Technology”, the spacing for water stop screws is usually between 400 and 600. The actual spacing should depend on the requirements of the construction plan design scheme. Due to the extremely thin thickness of the construction unit wall in some areas, the spacing for water stop screws is specified to be large in such situations. The actual spacing involves the application diameter of the water stop screw and the aspect ratio of the frame column, which can be obtained by conducting actual calculations.

PVC管材的安装方法: 1,PVC管在与钢管连接的时候,要先将钢管的连接处擦胶水,将PVC管加热后变软不会烧焦,然后承插在钢管上做降温处理。 2,粘接的时候严禁沾到水,PVC管必须放平在沟内,接头24小时后开始回填,要将管道的四周填紧,接头部位大批量回填。 3,玻璃纤维固化剂配成的树脂溶液浸渍玻璃纤维布之后,均匀缠绕在管道的渗漏出然后固化形成玻璃钢。 4,套补粘接法主要是针对管道小孔和接头的渗漏,选用统一的口径管材将其纵向剖开,然后将管内和外表面打毛,涂胶后在漏水处贴紧。

Installation method of PVC pipes:

1. When connecting PVC pipes to steel pipes, the joints of the pipes should be rubbed with glue first, and the PVC pipes should be heated to become soft without burning. Then, they should be inserted onto the steel pipes for cooling treatment.

2. During bonding, it is strictly prohibited to touch water. PVC pipes must be placed flat in the trench, and backfilling should begin 24 hours after the joint. The surrounding areas of the pipeline should be filled tightly, and the joint parts should be backfilled in large quantities.

3. After the resin solution prepared with glass fiber curing agent is impregnated with glass fiber cloth, it is evenly wrapped around the leakage of the pipeline and then solidified to form fiberglass.

4. The patching and bonding method is mainly aimed at the leakage of small holes and joints in the pipeline. A unified caliber pipe material is selected to longitudinally cut it open, and then the inner and outer surfaces of the pipe are roughened. After applying glue, it is tightly adhered to the leaking area.

一、钢筋连接套筒和钢筋接头的使用安装 1、钢筋就位:将丝头查验合格的钢筋搬运至待联接处。 2、接头拧紧:运用扳手或管钳等东西将联接接头拧紧。 3、作符号:对现已拧紧的接头作符号,与未拧紧的接头区分隔。 4、施工查验:对施工完的接头进行的质量查验。 5、绑扎其它钢筋。 钢筋接头加工的技术是需要十分慎重的进程需要的,我们可以经过比较其他加工技术而言,钢筋接头的技术进程是十分慎重的。

1、 Use and installation of steel bar connection sleeves and steel bar joints 1. Steel bars in place: Transport the steel bars that have passed the wire head inspection to the joint to be connected. 2. Joint tightening: Use a wrench or pipe wrench to tighten the joint. 3. Mark: Mark the joints that have been tightened and separate them from the area of the joints that have not been tightened. 4. Construction inspection: Quality inspection of joints after construction. 5. Bind other steel bars. The technology of processing steel bar joints requires a very cautious process, and we can compare it with other processing technologies. The technical process of steel bar joints is very cautious.

一、提高施工质量 铁马凳的采用,对建筑施工来说,是一种施工技术,因产品为工厂标准化、规格化生产,故其质量比人工制作的马镫更为标准,更加控制板楼下层钢筋保护层的标准性,并有效控制了上下层钢筋的间距。而且通过支架的使用,便于工地施工管理的规范,减少施工随意性。 二、提高施工效率 与传统人工工地现场制作的马镫相比,铁马凳因产品轻巧,安装简便,易于定位,从而减小施工人员劳动强度,通过实际使用情况测算,平均提高现场钢筋施工效率20%左右,在加快了钢筋混凝土施工进度的同时降低了施工成本。并且减少了工地的焊接,有利于提高项目施工的安全性。 三、降低施工成本 铁马凳的使用不仅有效控制工地废料的产生(包括工人现场制作马镫的认为损耗),而且减少了工人现场加工量,节约了工地现场用电量,很大程度降低了生产成本。并且我公司的产品价格比施工现场所用废钢筋制作的铁马凳节约成本30%左右,比用成品钢筋制作的马镫节约成本50%左右,直接降低施工成本。

1、 The use of iron horse stools to improve construction quality is a construction technology for building construction. As the product is standardized and produced by the factory, its quality is more standardized than that of manually made stirrups, which better controls the standardization of the protective layer of the lower steel bars in the slab building and effectively controls the spacing between the upper and lower steel bars. Moreover, the use of brackets facilitates standardized construction management on the construction site and reduces the randomness of construction. 2、 Compared with traditional manual on-site production of stirrups, the iron horse stool reduces the labor intensity of construction personnel due to its lightweight, easy installation, and easy positioning. Based on actual usage, it increases the on-site steel bar construction efficiency by an average of about 20%, accelerating the progress of reinforced concrete construction and reducing construction costs. And it reduces welding on the construction site, which is beneficial for improving the safety of project construction. 3、 The use of iron horse stools to reduce construction costs not only effectively controls the generation of waste materials on the construction site (including the perceived loss of stirrups made by workers on site), but also reduces the on-site processing volume of workers, saves electricity consumption on the construction site, and greatly reduces production costs. And our company’s product price saves about 30% of the cost compared to the iron horse stool made of waste steel bars on the construction site, and about 50% of the cost compared to the stirrup made of finished steel bars, directly reducing construction costs.