四川君见玮贸易有限公司

Sichuan Junjianwei Trading Co.

火勾厂家电话_火勾生产厂家电话-火勾厂家_君见玮辅材标件

JUNJIANWEI

火勾
Fire hook

产品图片
Product image

火勾厂家电话_火勾生产厂家电话-火勾厂家_君见玮辅材标件

产品适用方案
Product applicability plan

建筑工程用步步紧火钩参数详细介绍
Detailed introduction to the parameters of step-by-step fire hooks used in construction engineering
建筑工地用的步步紧 火钩其实很简单,像四川地区会叫做火钩它主要分为主杆和外面的活动卡扣,但是还有有很多人多这个建筑工地常用的固具,所以我们步步紧火钩厂家录制一段木工用建筑步步紧火钩,希望可以帮助到大家。视频中我们从木工用步步紧火钩的6个方面,展开讲解。
The step-by-step fire hook used on construction sites is actually very simple. For example, it is called a fire hook in the Sichuan region. It is mainly divided into the main pole and the external movable buckle. However, there are many people who use this commonly used fixture on construction sites. Therefore, our step-by-step fire hook manufacturer recorded a section of a carpentry construction step-by-step fire hook, hoping to help everyone. In the video, we will explain six aspects of using step-by-step tightening hooks for woodworking.
1、步步紧火钩厚度和宽度,常用的步步紧火钩厚度有五个厚的,六个厚的,宽度用的比较多的是2.8公分的,也有3.5公分的。
2、步步紧火钩规格我们厂生产步步紧火钩规格型号有60,70,80,90,100,120。这里单位是毫米。常用的是70公分,80公分的。
3、 步步紧火钩材质主要是回收料加工的。
4、步步紧火钩重量:像70公分重量有1.2斤和1.3公斤的,80公分重量有1. 3和1 .5公斤的,90公分重量是1.9斤。
5. 步步紧火钩价格是按照所要型号重量计算的。要的多话,按照每吨计算大概4000左右。
6. 步步紧火钩用途我们都了解主要用在桥梁房建初期的主体框架上,对柱子或者模板进行加固。

1. The thickness and width of the step by step tight fire hook are commonly used. The thickness of the step by step tight fire hook is five thick, six thick, and the width is commonly used, ranging from 2.8 cm to 3.5 cm.
2. Our factory produces the specifications and models of Bubu Tight Fire Hook, including 60,70,80,90100120. The unit here is millimeters. The commonly used ones are 70cm and 80cm.
3. The material of the step-by-step tightening hook is mainly processed with recycled materials.
4. Step by step, the weight of the fire hook is 1.2 kilograms and 1.3 kilograms for a weight of 70 centimeters, and 1 The weight of 3 and 1.5 kilograms is 1.9 pounds at 90 centimeters.
5. The price of the step-by-step tightening hook is calculated based on the weight of the desired model. If you want more, it’s about 4000 per ton.
6. We all understand the use of step-by-step fire hooks, which are mainly used on the main frame of bridge buildings in the early stages of construction, to reinforce columns or templates.

ensure the smooth progress of each construction process. According to the erected position, it is divided into external scaffold and internal scaffold; According to different materials, it can be divided into wood scaffolding, bamboo scaffolding, and steel pipe scaffolding; According to the structural form, it is divided into upright scaffolding, bridge scaffolding, portal scaffolding, suspended scaffolding, hanging scaffolding, cantilever scaffolding, and climbing scaffolding.

the structural form, it is divided into upright scaffolding, bridge scaffolding, portal scaffolding, suspended scaffolding, hanging scaffolding, cantilever scaffolding, and climbing scaffolding.

如您有意咨询请给我们君见玮致电
我们期待您的来电!

If you are interested in consulting, please call us Jun Jianwei We look forward to your call!

咨询电话:18733020585 18508222730

Consultation hotline

我们知道止水螺杆普遍的操作方法是木模板或复合型模版时选用,止水螺杆这一在标准里〈施工工艺〉的规定是常见间隔在400~600,实际的间隔,应当看施工计划设计方案上的要求,由于有的的地区施工单位墙的薄厚非常后,这类状况下止水螺杆间隔就规定就大。实际间隔牵涉到止水螺杆的应用直径、框架柱的高宽比,再开展实际的测算就可以得到。

We know that the common operating method for water stop screws is to use wooden templates or composite templates. In the standard “Construction Technology”, the spacing for water stop screws is usually between 400 and 600. The actual spacing should depend on the requirements of the construction plan design scheme. Due to the extremely thin thickness of the construction unit wall in some areas, the spacing for water stop screws is specified to be large in such situations. The actual spacing involves the application diameter of the water stop screw and the aspect ratio of the frame column, which can be obtained by conducting actual calculations.

PVC管材的安装方法: 1,PVC管在与钢管连接的时候,要先将钢管的连接处擦胶水,将PVC管加热后变软不会烧焦,然后承插在钢管上做降温处理。 2,粘接的时候严禁沾到水,PVC管必须放平在沟内,接头24小时后开始回填,要将管道的四周填紧,接头部位大批量回填。 3,玻璃纤维固化剂配成的树脂溶液浸渍玻璃纤维布之后,均匀缠绕在管道的渗漏出然后固化形成玻璃钢。 4,套补粘接法主要是针对管道小孔和接头的渗漏,选用统一的口径管材将其纵向剖开,然后将管内和外表面打毛,涂胶后在漏水处贴紧。

Installation method of PVC pipes:

1. When connecting PVC pipes to steel pipes, the joints of the pipes should be rubbed with glue first, and the PVC pipes should be heated to become soft without burning. Then, they should be inserted onto the steel pipes for cooling treatment.

2. During bonding, it is strictly prohibited to touch water. PVC pipes must be placed flat in the trench, and backfilling should begin 24 hours after the joint. The surrounding areas of the pipeline should be filled tightly, and the joint parts should be backfilled in large quantities.

3. After the resin solution prepared with glass fiber curing agent is impregnated with glass fiber cloth, it is evenly wrapped around the leakage of the pipeline and then solidified to form fiberglass.

4. The patching and bonding method is mainly aimed at the leakage of small holes and joints in the pipeline. A unified caliber pipe material is selected to longitudinally cut it open, and then the inner and outer surfaces of the pipe are roughened. After applying glue, it is tightly adhered to the leaking area.

一、钢筋连接套筒和钢筋接头的使用安装 1、钢筋就位:将丝头查验合格的钢筋搬运至待联接处。 2、接头拧紧:运用扳手或管钳等东西将联接接头拧紧。 3、作符号:对现已拧紧的接头作符号,与未拧紧的接头区分隔。 4、施工查验:对施工完的接头进行的质量查验。 5、绑扎其它钢筋。 钢筋接头加工的技术是需要十分慎重的进程需要的,我们可以经过比较其他加工技术而言,钢筋接头的技术进程是十分慎重的。

1、 Use and installation of steel bar connection sleeves and steel bar joints 1. Steel bars in place: Transport the steel bars that have passed the wire head inspection to the joint to be connected. 2. Joint tightening: Use a wrench or pipe wrench to tighten the joint. 3. Mark: Mark the joints that have been tightened and separate them from the area of the joints that have not been tightened. 4. Construction inspection: Quality inspection of joints after construction. 5. Bind other steel bars. The technology of processing steel bar joints requires a very cautious process, and we can compare it with other processing technologies. The technical process of steel bar joints is very cautious.

一、提高施工质量 铁马凳的采用,对建筑施工来说,是一种施工技术,因产品为工厂标准化、规格化生产,故其质量比人工制作的马镫更为标准,更加控制板楼下层钢筋保护层的标准性,并有效控制了上下层钢筋的间距。而且通过支架的使用,便于工地施工管理的规范,减少施工随意性。 二、提高施工效率 与传统人工工地现场制作的马镫相比,铁马凳因产品轻巧,安装简便,易于定位,从而减小施工人员劳动强度,通过实际使用情况测算,平均提高现场钢筋施工效率20%左右,在加快了钢筋混凝土施工进度的同时降低了施工成本。并且减少了工地的焊接,有利于提高项目施工的安全性。 三、降低施工成本 铁马凳的使用不仅有效控制工地废料的产生(包括工人现场制作马镫的认为损耗),而且减少了工人现场加工量,节约了工地现场用电量,很大程度降低了生产成本。并且我公司的产品价格比施工现场所用废钢筋制作的铁马凳节约成本30%左右,比用成品钢筋制作的马镫节约成本50%左右,直接降低施工成本。

1、 The use of iron horse stools to improve construction quality is a construction technology for building construction. As the product is standardized and produced by the factory, its quality is more standardized than that of manually made stirrups, which better controls the standardization of the protective layer of the lower steel bars in the slab building and effectively controls the spacing between the upper and lower steel bars. Moreover, the use of brackets facilitates standardized construction management on the construction site and reduces the randomness of construction. 2、 Compared with traditional manual on-site production of stirrups, the iron horse stool reduces the labor intensity of construction personnel due to its lightweight, easy installation, and easy positioning. Based on actual usage, it increases the on-site steel bar construction efficiency by an average of about 20%, accelerating the progress of reinforced concrete construction and reducing construction costs. And it reduces welding on the construction site, which is beneficial for improving the safety of project construction. 3、 The use of iron horse stools to reduce construction costs not only effectively controls the generation of waste materials on the construction site (including the perceived loss of stirrups made by workers on site), but also reduces the on-site processing volume of workers, saves electricity consumption on the construction site, and greatly reduces production costs. And our company’s product price saves about 30% of the cost compared to the iron horse stool made of waste steel bars on the construction site, and about 50% of the cost compared to the stirrup made of finished steel bars, directly reducing construction costs.

主页
联系我们
菜单
返回
×
Scroll to Top